If the customer requires a ceiling hung system then the ceiling beam size is important because it tells the manufacturer what size beam hangers are required to hold up the runways.
Read more at: http://ping.fm/ARLcH…a-crane-system/
Showing posts with label Height. Show all posts
Showing posts with label Height. Show all posts
Thursday, October 13, 2011
Ceiling height or max height (how to quote a crane system)
The ceiling height or max height isn't really that important. All it pretty much tells the manufacture is: how much height there is to work with. This is only important when the customer doesn't know the height they need to lift/move a specific product.
Doesn't get any easier.
Read more at: http://ping.fm/XFakw…a-crane-system/
Doesn't get any easier.
Read more at: http://ping.fm/XFakw…a-crane-system/
Monday, August 03, 2009
Kundel Crane Qualification Sheet
Here are some basic questions/qualifications to ask yourself or the customer before quoting a overhead workstation crane. My next few posts will outline the importance of each qualification, and give examples of how we can attack different applications. Check back!
Crane Qualifications (Click on a qualification to see a preview)
CAPACITY ______
CEILING OR FLOOR _______
CEILING HEIGHT OR MAX HEIGHT _______
ANY OBSTRUCTIONS _______
BRIDGE LENGHT_______
NUMBER OF BRIDGES _______
RUNWAY LENGTH _______
OPTIONS: (check if applicable)
INTERNAL ELECTRIC _______
LOW HEADROOM RAISED BRIDGE _______
MOTORIZATION _______
Crane Qualifications (Click on a qualification to see a preview)
CAPACITY ______
CEILING OR FLOOR _______
CEILING HEIGHT OR MAX HEIGHT _______
ANY OBSTRUCTIONS _______
BRIDGE LENGHT_______
NUMBER OF BRIDGES _______
RUNWAY LENGTH _______
OPTIONS: (check if applicable)
INTERNAL ELECTRIC _______
LOW HEADROOM RAISED BRIDGE _______
MOTORIZATION _______
Labels:
Articulating Cranes,
Bridge,
Capacity,
Ceiling,
Electric,
Height,
Internal,
Kundel,
Length,
Motorization,
Qualification,
Runway
Subscribe to:
Posts (Atom)