Showing posts with label quoting. Show all posts
Showing posts with label quoting. Show all posts
Thursday, October 13, 2011
Ceiling height or max height (how to quote a crane system)
The ceiling height or max height isn't really that important. All it pretty much tells the manufacture is: how much height there is to work with. This is only important when the customer doesn't know the height they need to lift/move a specific product.
Doesn't get any easier.
Read more at: http://ping.fm/XFakw…a-crane-system/
Doesn't get any easier.
Read more at: http://ping.fm/XFakw…a-crane-system/
Ceiling or Floor (how to quote a crane system)
Ceiling or floor refers to how the customer wishes to support their crane system. In the most basic sense, there are two types of supports - ceiling or floor (advanced applications might require a hybrid of both, but we'll get to that).
There are major differences between a ceiling mounted system and a floor mounted system (free-standing we call it). For one, a ceiling mounted system does not require posts. This means the manufacture doesn't need to make posts if the quote becomes a sale... i.e. saves the customer lots of $$. A free-standing system requires posts and I would estimate 80% of all systems we sell are free standing.
Trolley eye height is also another factor when it comes to a ceiling or free standing system. With a ceiling hung system, the trolley eye height is achieved by coming down from the ceiling (this is pretty easy and there is a lot of room for adjustment [assuming there is a high ceiling] - which can be done by the customer).
On the other hand, a free standing system trolley eye height is achieved by coming up from the ground. Not a lot of room for adjustment so make sure you get a pretty accurate trolley eye height.
Let me know if this was helpful - kind of confusing, but that's probably thanks to my writing style.
Read more @ http://kundelcranes.wordpress.com/2011/10/05/ceiling-or-flo…a-crane-system/
There are major differences between a ceiling mounted system and a floor mounted system (free-standing we call it). For one, a ceiling mounted system does not require posts. This means the manufacture doesn't need to make posts if the quote becomes a sale... i.e. saves the customer lots of $$. A free-standing system requires posts and I would estimate 80% of all systems we sell are free standing.
Trolley eye height is also another factor when it comes to a ceiling or free standing system. With a ceiling hung system, the trolley eye height is achieved by coming down from the ceiling (this is pretty easy and there is a lot of room for adjustment [assuming there is a high ceiling] - which can be done by the customer).
On the other hand, a free standing system trolley eye height is achieved by coming up from the ground. Not a lot of room for adjustment so make sure you get a pretty accurate trolley eye height.
Let me know if this was helpful - kind of confusing, but that's probably thanks to my writing style.
Read more @ http://kundelcranes.wordpress.com/2011/10/05/ceiling-or-flo…a-crane-system/
Capacity (how to quote a crane system)
The capacity requirements needed for the crane system your quoting (assuming your quoting one) is, by far, the most important item. Capacity helps a crane manufacturer determine:
-the type of system
-what size runways/bridges need to be used
-the maximum distance between two support locations
-the maximum cantilever that can be achieved
-the overall bridge rating requirements
-the number of supports needed
-what bridge spans can be achieved with that capacity
-floor rating requirements (free-standing)
-ceiling rating requirements (ceiling hung)
-trolley/endtruck requirements
see more at http://ping.fm/v5cF9…a-crane-system/
-the type of system
-what size runways/bridges need to be used
-the maximum distance between two support locations
-the maximum cantilever that can be achieved
-the overall bridge rating requirements
-the number of supports needed
-what bridge spans can be achieved with that capacity
-floor rating requirements (free-standing)
-ceiling rating requirements (ceiling hung)
-trolley/endtruck requirements
see more at http://ping.fm/v5cF9…a-crane-system/
How to quote a crane system
Okay, I'll just run down our quoting sheet so you get an idea of the type of information to look for when quoting a crane system. We give this sheet to our new sales employees when they call on potential customers. I'll bold the most important items.
GENERAL SPECS:
Customer Name __________
Project Name __________
Customer Phone # __________
Capacity __________
SUPPORT SPECS:
Ceiling or Floor __________
Ceiling height or max height __________
Ceiling type __________
Ceiling beam size __________
Any ceiling obstructions __________
BRIDGE SPECS:
Length or max outer dimensions __________
# of bridges __________
Trolley height required __________
RUNWAY SPECS:
Length __________
Center line of supports __________
OPTION SPECS
Internal electric bar __________
External electric festooning __________
External air festooning __________
Raised Bridge Ends __________
Motorization __________
read more at http://ping.fm/LSZR6
GENERAL SPECS:
Customer Name __________
Project Name __________
Customer Phone # __________
Capacity __________
SUPPORT SPECS:
Ceiling or Floor __________
Ceiling height or max height __________
Ceiling type __________
Ceiling beam size __________
Any ceiling obstructions __________
BRIDGE SPECS:
Length or max outer dimensions __________
# of bridges __________
Trolley height required __________
RUNWAY SPECS:
Length __________
Center line of supports __________
OPTION SPECS
Internal electric bar __________
External electric festooning __________
External air festooning __________
Raised Bridge Ends __________
Motorization __________
read more at http://ping.fm/LSZR6